Disused wasteland and garages have been put back into good use through Greenwich Council’s framework for new local authority housing. The Eco Team, working with Schuco, provided photovoltaic systems for a number of projects on phase 2 helping the local authority meet building code level 4 on their new housing stock. Weathered upstands were constructed by the roofing contractor on the green roofs, enabling mechanical fixing of the PB mounting frames and modules. All designs of the PV systems, to meet the required renewable requirements was carried out by The Eco Team.