The photovoltaic requirement for this project consisted of 29.4 Kwp of Schuco modules to be fitted across 3 blocks. The modules were mounted on bespoke, galvanised steel, feature upstands on the flat green roofs. The Eco Team carried out the design and layout of the PV system in conjunction with Pinnacle ESP (building services consultants), from an early stage to ensure the correct sizing for the manufacturer of the feature upstands, and the provision of adequate space for the necessary plant. This process led to a quick and trouble-free installation.