The Eco Team’s involvement in this very large housing scheme included the design, supply and installation of photovoltaic requirements for Phase 4. This project consisted of multiple PV arrays on both the blocks and houses and required mounting systems for flat green roofs, pitched, tiled roofs and standing seam, zinc and pitched roofs.
Main contractor feedback to The Eco Team commented on their ability for maintaining fitting schedules, liaison with site management and other trades, and the quality of the service from design to completion. The Eco Team are currently working with the contractor at the design stage on other upcoming projects.